Assessment Year | 1993 |
---|---|
Principal Product | Industrial Pumps |
NAICS |
n/a
|
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $50 M to 100M |
# of Employees | 377 |
Plant Area |
174,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $297,695 | 5,173,505 |
kWh
|
$0.058 |
Natural Gas | $68,000 | 15,299 |
MMBtu
|
$4.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $68,012 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $65,897 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.8123: Pay utility bills on time | $2,115 | - |
$2,115
-
kWh
|
- | |
02 | 2.3212: Optimize plant power factor | $14,702 | $9,250 |
$14,702
-
kWh
|
- | |
03 | 2.3312: Install efficient rectifiers | $1,456 | $15,000 |
$1,456
-
kWh
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $6,180 | $4,000 |
$6,180
-
kWh
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $31,259 | $6,000 | - |
$31,259
-
MMBtu
|
|
06 | 3.4115: Recover and reuse cooling water | $12,300 | $1,000 |
$12,300
57,444
kWh
|
- | |
TOTAL RECOMMENDED | $68,012 | $35,250 |
$36,753
57,444
kWh
|
$31,259
-
MMBtu
|
||
TOTAL IMPLEMENTED | $65,897 | $35,250 |
$34,638
57,444
kWh
|
$31,259
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs