ITAC Assessment: MS0058
ITAC logo
ITAC Assessment: MS0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product periodicals
NAICS
n/a
SIC 2721: Periodicals: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 425
Plant Area 140,000
ft2
Annual Production 55,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $483,612 10,932,005
kWh
Electricity Demand $71,178 23,803
kW-mo/yr
Electricity Fees $114,450 -
Natural Gas $54,007 18,276
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,595 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.7261: Install timers and/or thermostats $4,932 $2,552 $4,725
137,456
kWh
- $207 - -
02 2.7261: Install timers and/or thermostats $5,026 $1,624 $4,816
140,094
kWh
- $210 - -
03 2.4314: Use synthetic lubricant $3,493 $410 $2,699
78,546
kWh
$458
-
kW-mo/yr
$336 - -
04 2.7314: Reduce ventilation air $11,167 $3,016 $7,990
232,415
kWh
$1,912
-
kW-mo/yr
$1,265 - -
05 2.4221: Install compressor air intakes in coolest locations $1,219 $288 $872
25,498
kWh
$209
-
kW-mo/yr
$138 - -
06 2.1113: Reduce combustion air flow to optimum $507 $261 $362
10,551
kWh
$88
-
kW-mo/yr
$57 - -
07 3.7196: Use re-usable filters $4,251 $5,190 - - - $3
-
lb
$4,248
TOTAL RECOMMENDED $30,595 $13,341 $21,464
624,560
kWh
$2,667
-
kW-mo/yr
$2,213 $3
-
lb
$4,248
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs