ITAC Assessment: MS0034
ITAC logo
ITAC Assessment: MS0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Boilers and Water Treatment Systems
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 52,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,778 1,735,053
kWh
Natural Gas $29,969 7,530
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,725 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,555

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $686 $2,455 $686
12,896
kWh
-
02 2.7122: Disconnect ballasts $1,005 $200 $1,005
19,637
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $407 $321 $407
7,620
kWh
-
04 2.2437: Recover waste heat from equipment $3,696 $3,080 - $3,696
-
MMBtu
05 2.7261: Install timers and/or thermostats $818 $730 $818
18,757
kWh
-
06 2.7231: Use radiant heater for spot heating $8,484 $21,600 - $8,484
-
MMBtu
07 2.7124: Make a practice of turning off lights when not needed $629 - $629
14,361
kWh
-
TOTAL RECOMMENDED $15,725 $28,386 $3,545
73,271
kWh
$12,180
-
MMBtu
TOTAL IMPLEMENTED $6,555 $4,331 $2,859
60,375
kWh
$3,696
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs