ITAC Assessment: UD0371
ITAC logo
ITAC Assessment: UD0371
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product GROUND AND ROAST BEEF
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area
n/a
Annual Production 43,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,719 3,266,706
kWh
Natural Gas $22,803 5,792
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,807 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,893

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6121: Reduce hot water temperature to the minimum required $1,032 $300 - $1,032
-
MMBtu
02 2.6232: Install set-back timers $473 - $473
10,258
kWh
-
03 2.2447: Heat water with exhaust heat $11,914 $47,000 $2,614
55,979
kWh
$9,300
-
MMBtu
04 2.4322: Use or replace with energy efficient substitutes $8,388 $45,000 $8,388
180,539
kWh
-
TOTAL RECOMMENDED $21,807 $92,300 $11,475
246,776
kWh
$10,332
-
MMBtu
TOTAL IMPLEMENTED $9,893 $45,300 $8,861
190,797
kWh
$1,032
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs