ITAC Assessment: KU0550
ITAC logo
ITAC Assessment: KU0550
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product store fixtures and displays
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 195
Plant Area 120,000
ft2
Annual Production 6,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,336 2,105,880
kWh
Electricity Demand $21,060 4,957
kW-mo/yr
Natural Gas $111,378 24,935
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $153,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2442: Preheat combustion air with waste heat $8,989 $17,000 - - $8,989
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,255 $650 $1,013
29,894
kWh
$242
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,038 $20 $837
24,326
kWh
$201
-
kW-mo/yr
- -
04 4.446: Automate finishing process $101,920 $34,000 - - - $101,920
05 4.652: Replace existing equipment with more suitable substitutes $40,768 $5,000 - - - $40,768
TOTAL RECOMMENDED $153,970 $56,670 $1,850
54,220
kWh
$443
-
kW-mo/yr
$8,989
-
MMBtu
$142,688
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs