| Assessment Year | 1995 |
|---|---|
| Principal Product | automotive stamping parts |
| NAICS |
n/a
|
| SIC | 3465: Automotive Stampings |
| Sales Range | $10 M to 50M |
| # of Employees | 190 |
| Plant Area |
120,000
ft2
|
| Annual Production | 104,000
ton
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $148,252 | 2,732,122 |
kWh
|
$0.054 |
| Natural Gas | $24,325 | 4,750 |
MMBtu
|
$5.12 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $82,505 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $25,080 | $945 |
$25,080
462,192
kWh
|
- | - | - | |
| 02 | 2.2437: Recover waste heat from equipment | $9,644 | $500 | - |
$9,644
-
MMBtu
|
- | - | |
| 03 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $4,127 | $1,378 | - |
$4,127
-
MMBtu
|
- | - | |
| 04 | 2.7444: Close holes and openings in building such as broken windows | $609 | $300 | - |
$609
-
MMBtu
|
- | - | |
| 05 | 2.8123: Pay utility bills on time | $1,712 | - | - | - | $1,712 | - | |
| 06 | 2.3212: Optimize plant power factor | $18,063 | $16,121 |
$18,063
-
kWh
|
- | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $477 | $429 |
$477
8,792
kWh
|
- | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $127 | $350 |
$127
2,345
kWh
|
- | - | - | |
| 09 | 2.4133: Use most efficient type of electric motors | $9,738 | $15,425 |
$9,738
179,367
kWh
|
- | - | - | |
| 10 | 2.6212: Turn off equipment during breaks, reduce operating time | $186 | $560 |
$186
3,517
kWh
|
- | - | - | |
| 11 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $142 | $550 |
$239
4,396
kWh
|
$(-97.0)
-
MMBtu
|
- | - | |
| 12 | 3.1161: Eliminate/reduce an operation | $12,600 | $300 | - | - | - | $12,600 | |
| TOTAL RECOMMENDED | $82,505 | $36,858 |
$53,910
660,609
kWh
|
$14,283
-
MMBtu
|
$1,712 | $12,600 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs