ITAC Assessment: MA0237
ITAC logo
ITAC Assessment: MA0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product BLEACHED COTTON
NAICS
n/a
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area
n/a
Annual Production 32,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $651,729 8,207,796
kWh
Fuel Oil #6 $478,069 188,009
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $19,462 $200 $(-5,538.0)
(-69,754)
kWh
$25,000
-
MMBtu
02 2.2121: Increase amount of condensate returned $6,172 $1,000 - $6,172
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,049 $2 $4,049
50,996
kWh
-
04 2.7224: Reduce space conditioning during non-working hours $3,462 $2,000 - $3,462
-
MMBtu
05 2.3132: Recharge batteries on during off-peak demand periods $2,753 - $2,753
-
kWh
-
06 2.2511: Insulate bare equipment $2,398 $200 - $2,398
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,234 $400 $2,234
28,136
kWh
-
TOTAL RECOMMENDED $40,530 $3,802 $3,498
9,378
kWh
$37,032
-
MMBtu
TOTAL IMPLEMENTED $40,530 $3,802 $3,498
9,378
kWh
$37,032
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs