ITAC Assessment: OR0293
ITAC logo
ITAC Assessment: OR0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Scoured Wool
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area
n/a
Annual Production 2,080,500
lb
Production Hrs. Annual 2,125
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,511 391,559
kWh
Electricity Demand $9,614 2,364
kW-mo/yr
Electricity Fees $789 -
Natural Gas $52,134 17,938
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $202,003 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $201,231

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $361 $500 - - - $361
-
MMBtu
- - -
02 2.3212: Optimize plant power factor $772 $2,600 - - $772 - - - -
03 2.4133: Use most efficient type of electric motors $1,210 $4,665 $640
17,878
kWh
$570
-
kW-mo/yr
- - - - -
04 3.4145: Use magnetic technology to treat water $149,760 $238,000 $(-2,470.0)
(-69,461)
kWh
$(-570.0)
-
kW-mo/yr
- - $195,700
-
Tgal
$(-42,900.0)
-
lb
-
05 4.611: Begin a practice of predictive / preventative maintenance $1,000 - - - - - - - $1,000
06 4.441: Install automatic packing equipment $48,900 $70,000 $(-1,200.0)
(-34,291)
kWh
$(-900.0)
-
kW-mo/yr
- - - - $51,000
TOTAL RECOMMENDED $202,003 $315,765 $(-3,030.0)
(-85,874)
kWh
$(-900.0)
-
kW-mo/yr
$772 $361
-
MMBtu
$195,700
-
Tgal
$(-42,900.0)
-
lb
$52,000
TOTAL IMPLEMENTED $201,231 $313,165 $(-3,030.0)
(-85,874)
kWh
$(-900.0)
-
kW-mo/yr
- $361
-
MMBtu
$195,700
-
Tgal
$(-42,900.0)
-
lb
$52,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings