ITAC Assessment: MS0001
ITAC logo
ITAC Assessment: MS0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Automotive Coil Springs
NAICS
n/a
SIC 3493: Steel Springs, Except Wire
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 140,000
ft2
Annual Production 750,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $273,952 5,495,897
kWh
Natural Gas $244,619 37,375
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,661

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $15,400 $2,700 - $15,400
-
MMBtu
02 2.6231: Utilize controls to operate equipment only when needed $7,346 $1,500 $7,346
244,725
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,885 $10,156 $4,885
90,856
kWh
-
04 2.3212: Optimize plant power factor $4,580 $4,500 $4,580
-
kWh
-
05 2.4133: Use most efficient type of electric motors $2,165 $3,540 $2,165
24,326
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $372 $144 $372
6,741
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $124 $33 $124
2,345
kWh
-
TOTAL RECOMMENDED $34,872 $22,573 $19,472
368,993
kWh
$15,400
-
MMBtu
TOTAL IMPLEMENTED $2,661 $3,717 $2,661
33,412
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs