ITAC Assessment: MO0282
ITAC logo
ITAC Assessment: MO0282
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Uniforms
NAICS
n/a
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 200
Plant Area 35,000
ft2
Annual Production 25,720
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,620 639,508
kWh
Electricity Demand $3,649 146
kW-mo/yr
Electricity Fees $6,619 -
Natural Gas $10,498 1,645
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,861 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,395 $15,233 $5,872
81,184
kWh
$523
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $987 $845 $912
12,603
kWh
$75
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $407 $122 $382
5,275
kWh
$25
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $407 $40 $382
5,275
kWh
$25
-
kW-mo/yr
- -
05 3.7198: Reduce / eliminate use of disposable product $338 $240 - - $338
-
lb
-
06 3.5313: Increase amount of waste recovered for resale $836 - - - $836
-
lb
-
07 4.445: Install equipment to move product $4,380 $338 - - - $4,380
08 4.446: Automate finishing process $5,111 $1,400 - - - $5,111
TOTAL RECOMMENDED $18,861 $18,218 $7,548
104,337
kWh
$648
-
kW-mo/yr
$1,174
-
lb
$9,491
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs