ITAC Assessment: MO0280
ITAC logo
ITAC Assessment: MO0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Boxing Equipment
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 240,000
ft2
Annual Production 108,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,404 1,149,472
kWh
Electricity Demand $10,358 438
kW-mo/yr
Electricity Fees $12,631 -
Natural Gas $53,123 51,667
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,205 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,045

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $2,311 $3,565 $2,027
30,774
kWh
$284
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $631 $175 $560
8,499
kWh
$71
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $909 $80 $791
12,016
kWh
$118
-
kW-mo/yr
- -
04 3.7198: Reduce / eliminate use of disposable product $194 $120 - - $194
-
lb
-
05 3.5315: Lease / purchase baler; sell cardboard to recycler $540 - - - $540
-
lb
-
06 4.322: Eliminate old stock and modify inventory control $10,800 $624 - - - $10,800
07 2.4156: Establish a preventative maintenance program $12,820 $3,700 - - - $12,820
TOTAL RECOMMENDED $28,205 $8,264 $3,378
51,289
kWh
$473
-
kW-mo/yr
$734
-
lb
$23,620
TOTAL IMPLEMENTED $4,045 $3,940 $3,378
51,289
kWh
$473
-
kW-mo/yr
$194
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs