Assessment Year | 2000 |
---|---|
Principal Product | pipe organs |
NAICS |
n/a
|
SIC | 3931: Musical Instruments |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
165,000
ft2
|
Annual Production | 23
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $25,458 | 581,770 |
kWh
|
$0.044 |
Electricity Demand | $17,961 | 282 |
kW-mo/yr
|
$63.69 |
Electricity Fees | $1,866 | - |
|
- |
Natural Gas | $26,931 | 5,720 |
MMBtu
|
$4.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,815 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,423 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $508 | $1,251 |
$317
6,741
kWh
|
$191
-
kW-mo/yr
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $988 | $1,945 |
$606
12,896
kWh
|
$382
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $119 | $88 |
$55
1,172
kWh
|
$64
-
kW-mo/yr
|
- | - | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,280 | $4,500 | - |
$8,280
-
kW-mo/yr
|
- | - | |
05 | 4.652: Replace existing equipment with more suitable substitutes | $124 | $276 |
$124
2,638
kWh
|
- | - | - | |
06 | 3.7198: Reduce / eliminate use of disposable product | $396 | $960 | - | - |
$396
-
lb
|
- | |
07 | 4.446: Automate finishing process | $6,240 | $205 | - | - | - | $6,240 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,160 | $486 | - | - | - | $4,160 | |
TOTAL RECOMMENDED | $20,815 | $9,711 |
$1,102
23,447
kWh
|
$8,917
-
kW-mo/yr
|
$396
-
lb
|
$10,400 | ||
TOTAL IMPLEMENTED | $11,423 | $2,990 |
$372
7,913
kWh
|
$255
-
kW-mo/yr
|
$396
-
lb
|
$10,400 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs