Assessment Year | 2013 |
---|---|
Principal Product | molds and dies |
NAICS | 331511: Iron Foundries |
SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
46,280
ft2
|
Annual Production | 600
pieces
|
Production Hrs. Annual | 5,187
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $127,935 | 1,974,900 |
kWh
|
$0.065 |
Electricity Demand | $12,321 | 4,584 |
kW-mo/yr
|
$2.69 |
Natural Gas | $2,688 | 273 |
MMBtu
|
$9.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,658 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,152 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,135 | $24,628 |
$9,247
142,694
kWh
|
$888
-
kW-mo/yr
|
|
02 | 2.7135: Install occupancy sensors | $3,261 | $1,020 |
$3,261
50,326
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,880 | $950 |
$3,540
54,630
kWh
|
$340
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,699 | - |
$2,470
38,124
kWh
|
$229
-
kW-mo/yr
|
|
05 | 2.2692: Use outside cold water source as a supply of cooling water | $10,146 | $59,000 |
$9,254
142,861
kWh
|
$892
-
kW-mo/yr
|
|
06 | 2.7221: Lower temperature during the winter season and vice-versa | $2,418 | - |
$2,119
32,705
kWh
|
$299
-
kW-mo/yr
|
|
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,099 | - | - |
$3,099
-
kW-mo/yr
|
|
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $247 | $100 |
$226
3,483
kWh
|
$21
-
kW-mo/yr
|
|
09 | 2.6218: Turn off equipment when not in use | $50 | - |
$45
689
kWh
|
$5
-
kW-mo/yr
|
|
10 | 2.6218: Turn off equipment when not in use | $21 | $60 |
$18
285
kWh
|
$3
-
kW-mo/yr
|
|
11 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $702 | $9,752 |
$651
10,046
kWh
|
$51
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $36,658 | $95,510 |
$30,831
475,843
kWh
|
$5,827
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $20,152 | $35,490 |
$18,316
282,656
kWh
|
$1,836
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs