Assessment Year | 1997 |
---|---|
Principal Product | Components for Axles, Light Trucks and Heavy Pick-UP Trucks |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 370 |
Plant Area |
140,000
ft2
|
Annual Production | 3,400,000
pieces
|
Production Hrs. Annual | 7,700
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $707,148 | 17,557,738 |
kWh
|
$0.040 |
Electricity Demand | $48,960 | 2,451 |
kW-mo/yr
|
$19.98 |
Electricity Fees | $91,568 | - |
|
- |
Natural Gas | $271,837 | 60,354 |
MMBtu
|
$4.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $140,732 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $138,774 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.711: Initiate a total quality management program | $21,115 | $25,000 | - | - | - | - | $21,115 | |
02 | 4.432: Cross-train personnel to avoid lost time | $18,140 | $20,000 | - | - | - | - | $18,140 | |
03 | 4.611: Begin a practice of predictive / preventative maintenance | $10,274 | $9,500 | - | - | - | - | $10,274 | |
04 | 4.514: Re-arrange equipment layout to reduce handling costs | $6,300 | $12,500 | - | - | - | - | $6,300 | |
05 | 3.5131: Recycle white water | $44,299 | $81,000 | - | - |
$44,299
-
gal
|
- | - | |
06 | 3.7196: Use re-usable filters | $1,958 | $5,281 | - | - | - |
$1,958
-
lb
|
- | |
07 | 2.4131: Size electric motors for peak operating efficiency | $20,198 | $28,087 |
$19,231
422,919
kWh
|
$967
-
kW-mo/yr
|
- | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $11,419 | $334 |
$10,872
239,156
kWh
|
$547
-
kW-mo/yr
|
- | - | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,891 | $80 |
$2,753
60,375
kWh
|
$138
-
kW-mo/yr
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,341 | $3,144 |
$2,199
48,359
kWh
|
$142
-
kW-mo/yr
|
- | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,174 | $922 |
$1,104
24,326
kWh
|
$70
-
kW-mo/yr
|
- | - | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $623 | $1,346 |
$593
13,189
kWh
|
$30
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $140,732 | $187,194 |
$36,752
808,324
kWh
|
$1,894
-
kW-mo/yr
|
$44,299
-
gal
|
$1,958
-
lb
|
$55,829 | ||
TOTAL IMPLEMENTED | $138,774 | $181,913 |
$36,752
808,324
kWh
|
$1,894
-
kW-mo/yr
|
$44,299
-
gal
|
- | $55,829 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs