Assessment Year | 1995 |
---|---|
Principal Product | liquid plastisol |
NAICS |
n/a
|
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $10 M to 50M |
# of Employees | 68 |
Plant Area |
80,000
ft2
|
Annual Production | 21,500,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $149,436 | 1,935,229 |
kWh
|
$0.077 |
Natural Gas | $58,443 | 10,828 |
MMBtu
|
$5.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,381 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,541 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $942 | $1,195 | - |
$942
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,985 | $9,936 |
$2,985
38,980
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,072 | $661 |
$1,072
14,068
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,912 | $383 |
$1,912
25,791
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $195 | $100 |
$195
2,638
kWh
|
- | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,394 | $2,347 | - |
$1,394
-
MMBtu
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $41 | $25 |
$41
586
kWh
|
- | - | |
08 | 3.1163: Use plastic pallets instead of wood | $840 | $1,960 | - | - |
$840
-
lb
|
|
TOTAL RECOMMENDED | $9,381 | $16,607 |
$6,205
82,063
kWh
|
$2,336
-
MMBtu
|
$840
-
lb
|
||
TOTAL IMPLEMENTED | $8,541 | $14,647 |
$6,205
82,063
kWh
|
$2,336
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs