ITAC Assessment: MO0142
ITAC logo
ITAC Assessment: MO0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product liquid plastisol
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 80,000
ft2
Annual Production 21,500,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,436 1,935,229
kWh
Natural Gas $58,443 10,828
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,381 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,541

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $942 $1,195 - $942
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,985 $9,936 $2,985
38,980
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,072 $661 $1,072
14,068
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,912 $383 $1,912
25,791
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $195 $100 $195
2,638
kWh
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,394 $2,347 - $1,394
-
MMBtu
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $41 $25 $41
586
kWh
- -
08 3.1163: Use plastic pallets instead of wood $840 $1,960 - - $840
-
lb
TOTAL RECOMMENDED $9,381 $16,607 $6,205
82,063
kWh
$2,336
-
MMBtu
$840
-
lb
TOTAL IMPLEMENTED $8,541 $14,647 $6,205
82,063
kWh
$2,336
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs