ITAC Assessment: OK0347
ITAC logo
ITAC Assessment: OK0347
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FLOOR CLEANING EQUIPMENT
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 213
Plant Area
n/a
Annual Production 10,500
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,151 2,560,082
kWh
Natural Gas $66,242 16,325
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,115

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $9,744 $3,000 - $9,744
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $563 $549 $563
10,258
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $808 - $908
32,239
kWh
- $(-100.0)
TOTAL RECOMMENDED $11,115 $3,549 $1,471
42,497
kWh
$9,744
-
MMBtu
$(-100.0)
TOTAL IMPLEMENTED $11,115 $3,549 $1,471
42,497
kWh
$9,744
-
MMBtu
$(-100.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs