ITAC Assessment: MO0127
ITAC logo
ITAC Assessment: MO0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product business forms
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 72,000
ft2
Annual Production 8,016,455
lb
Production Hrs. Annual 7,680
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,398 1,956,624
kWh
Natural Gas $1,897 346
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,023

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,858 $17,300 $7,858
125,440
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $645 $180 $645
10,258
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $171 $275 $171
2,638
kWh
-
04 2.4133: Use most efficient type of electric motors $6,393 $8,118 $6,393
102,286
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,433 $140 $1,433
22,860
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $4,043 $822 $4,043
64,478
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,313 $50 $1,313
21,102
kWh
-
08 2.6121: Reduce hot water temperature to the minimum required $523 $75 $523
8,499
kWh
-
09 2.7447: Install vinyl strip / high speed / air curtain doors $223 $292 $75
1,172
kWh
$148
-
MMBtu
TOTAL RECOMMENDED $22,602 $27,252 $22,454
358,733
kWh
$148
-
MMBtu
TOTAL IMPLEMENTED $17,023 $26,088 $17,023
271,981
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs