Assessment Year | 1994 |
---|---|
Principal Product | business forms |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
72,000
ft2
|
Annual Production | 8,016,455
lb
|
Production Hrs. Annual | 7,680
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $120,398 | 1,956,624 |
kWh
|
$0.062 |
Natural Gas | $1,897 | 346 |
MMBtu
|
$5.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,602 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,023 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,858 | $17,300 |
$7,858
125,440
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $645 | $180 |
$645
10,258
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $171 | $275 |
$171
2,638
kWh
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $6,393 | $8,118 |
$6,393
102,286
kWh
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,433 | $140 |
$1,433
22,860
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $4,043 | $822 |
$4,043
64,478
kWh
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,313 | $50 |
$1,313
21,102
kWh
|
- | |
08 | 2.6121: Reduce hot water temperature to the minimum required | $523 | $75 |
$523
8,499
kWh
|
- | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $223 | $292 |
$75
1,172
kWh
|
$148
-
MMBtu
|
|
TOTAL RECOMMENDED | $22,602 | $27,252 |
$22,454
358,733
kWh
|
$148
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,023 | $26,088 |
$17,023
271,981
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs