ITAC Assessment: SF0543
ITAC logo
ITAC Assessment: SF0543
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Computer Servers & Fiber Optic Cables
NAICS 334111: Electronic Computer Manufacturing
SIC 3572: Computer Storage Devices
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area 3,500
ft2
Annual Production 1,500
units
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,962 495,977
kWh
TOTAL YEARLY COSTS $119,962
RECOMMENDED SAVINGS* $39,553 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,553

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.7224: Reduce space conditioning during non-working hours $1,772 $757 $1,772
7,327
kWh
-
02 2.2691: Shut off cooling if cold outside air will cool process $24,608 $15,012 $24,608
101,742
kWh
-
03 2.7212: Install or upgrade insulation on hvac distribution systems $637 $654 $637
2,635
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,245 $4,917 $2,245
9,283
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,652 $12,363 $3,569
14,755
kWh
$83
06 2.9114: Use solar heat to make electricty $6,639 $23,288 $6,639
27,450
kWh
-
TOTAL RECOMMENDED $39,553 $56,991 $39,470
163,192
kWh
$83
TOTAL IMPLEMENTED $39,553 $56,991 $39,470
163,192
kWh
$83
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs