ITAC Assessment: MO0117
ITAC logo
ITAC Assessment: MO0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product weather seals
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 319
Plant Area 96,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $432,771 8,391,559
kWh
Natural Gas $94,052 23,876
MMBtu
LPG $25,251 4,987
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,496 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,877

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $5,154 $2,340 $5,154
99,941
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,966 $15,637 $4,966
96,424
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,202 $611 $2,202
42,790
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $266 $760 $266
5,275
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $4,564 $2,374 $4,564
88,511
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $4,947 $100 $4,947
95,838
kWh
-
07 2.4133: Use most efficient type of electric motors $3,518 $12,983 $3,518
68,288
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $716 $695 $716
13,775
kWh
-
09 2.7444: Close holes and openings in building such as broken windows $1,611 $50 - $1,611
-
MMBtu
10 2.1311: Replace electrically-operated equipment with fossil fuel equipment $857 $1,057 $1,192
23,154
kWh
$(-335.0)
-
MMBtu
11 2.1311: Replace electrically-operated equipment with fossil fuel equipment $24,695 $19,160 $36,636
710,727
kWh
$(-11,941.0)
-
MMBtu
TOTAL RECOMMENDED $53,496 $55,767 $64,161
1,244,723
kWh
$(-10,665.0)
-
MMBtu
TOTAL IMPLEMENTED $1,877 $810 $266
5,275
kWh
$1,611
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs