ITAC Assessment: MO0114
ITAC logo
ITAC Assessment: MO0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Gas Pressure Switches
NAICS
n/a
SIC 3822: Automatic Controls for Regulating Residential and Commercial Environments and Appliances
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 80,000
ft2
Annual Production 3,400,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,559 2,055,686
kWh
LPG $16,036 2,650
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,143 $8,141 $2,143
38,394
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $902 $374 $902
16,120
kWh
- -
03 3.4114: Replace city water with recycled water via cooling tower $3,768 $2,845 - - $3,768
-
Tgal
04 2.7442: Keep doors and windows shut when not on use $1,617 $4,864 $1,617
29,015
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $627 $405 $627
11,137
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $900 $1,052 $900
16,120
kWh
- -
07 2.4314: Use synthetic lubricant $722 $768 $722
12,896
kWh
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $541 $90 $541
9,672
kWh
- -
09 2.7447: Install vinyl strip / high speed / air curtain doors $825 $1,317 $565
10,258
kWh
$260
-
MMBtu
-
10 2.7444: Close holes and openings in building such as broken windows $680 $190 $144
2,638
kWh
$536
-
MMBtu
-
11 2.7447: Install vinyl strip / high speed / air curtain doors $579 $1,317 $258
4,689
kWh
$321
-
MMBtu
-
12 2.6121: Reduce hot water temperature to the minimum required $492 $90 - $492
-
MMBtu
-
TOTAL RECOMMENDED $13,796 $21,453 $8,419
150,939
kWh
$1,609
-
MMBtu
$3,768
-
Tgal
TOTAL IMPLEMENTED $900 $1,052 $900
16,120
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Water Disposal Savings