| Assessment Year | 1994 |
|---|---|
| Principal Product | Newspapers |
| NAICS |
n/a
|
| SIC | 2711: Newspapers: Publishing, or Publishing and Printing |
| Sales Range | $10 M to 50M |
| # of Employees | 234 |
| Plant Area |
90,000
ft2
|
| Annual Production | 5,000
ton
|
| Production Hrs. Annual | 2,808
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $126,526 | 1,867,819 |
kWh
|
$0.068 |
| Natural Gas | $15,159 | 2,162 |
MMBtu
|
$7.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,036 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,134 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,091 | $31,000 |
$5,091
75,029
kWh
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,140 | $1,183 |
$2,140
31,653
kWh
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $220 | $460 |
$220
3,224
kWh
|
- | - | - | |
| 04 | 2.7446: Utilize sensors controlling roof and wall openings | $2,700 | $1,800 | - | - | $2,700 | - | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,308 | $209 | - |
$2,308
-
MMBtu
|
- | - | |
| 06 | 2.8113: Purchase gas directly from a contract gas supplier | $1,721 | $5,100 | - | - | - | $1,721 | |
| 07 | 2.6121: Reduce hot water temperature to the minimum required | $1,375 | $90 | - |
$1,375
-
MMBtu
|
- | - | |
| 08 | 2.4133: Use most efficient type of electric motors | $1,833 | $4,453 |
$1,833
26,964
kWh
|
- | - | - | |
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,202 | $445 |
$1,202
17,878
kWh
|
- | - | - | |
| 10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $954 | $60 |
$954
14,068
kWh
|
- | - | - | |
| 11 | 2.4221: Install compressor air intakes in coolest locations | $492 | $400 |
$492
7,327
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $20,036 | $45,200 |
$11,932
176,143
kWh
|
$3,683
-
MMBtu
|
$2,700 | $1,721 | ||
| TOTAL IMPLEMENTED | $11,134 | $32,942 |
$7,451
109,906
kWh
|
$3,683
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs