Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Aluminum Extrusions
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 140,000
ft2
Annual Production 10,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $361,875 8,083,529
kWh
Natural Gas $279,774 77,658
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $327,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,409 $40 n/a $1,409
31,360
kWh
- - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $10,052 $2,000 n/a - $10,052
-
MMBtu
- -
03 2.4133: Use most efficient type of electric motors $781 $1,367 n/a $781
17,585
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $380 $70 n/a $380
8,499
kWh
- - -
05 2.3212: Optimize plant power factor $20,686 $17,000 n/a $20,686
-
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,939 $6,091 n/a $4,939
78,839
kWh
- - -
07 3.3123: Use decanting, flotation to remove contaminants $67,000 $226,000 n/a - - $67,000
-
Tgal
-
08 3.3128: Utilize other methods to remove contaminants $111,000 $376,000 n/a - - $111,000
-
Tgal
-
09 3.3128: Utilize other methods to remove contaminants $100,000 $251,000 n/a - - $100,000
-
Tgal
-
10 3.4155: Meter waste water $5,970 $1,000 n/a - - $5,970
-
Tgal
-
11 3.5315: Lease / purchase baler; sell cardboard to recycler $4,200 - n/a - - - $4,200
-
lb
12 3.5248: Separate and recycle scrap metal to foundry or for sale $960 - n/a - - - $960
-
lb
TOTAL RECOMMENDED $327,377 $880,568 $28,195
136,283
kWh
$10,052
-
MMBtu
$283,970
-
Tgal
$5,160
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs