Assessment Year | 2000 |
---|---|
Principal Product | Venting for fireplaces and boilers |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 76 |
Plant Area |
130,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $72,966 | 1,165,592 |
kWh
|
$0.063 |
Electricity Demand | $26,141 | 3,571 |
kW-mo/yr
|
$7.32 |
Electricity Fees | $8,834 | - |
|
- |
Natural Gas | $23,312 | 2,783 |
MMBtu
|
$8.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,632 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,469 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $4,970 | $500 | - | - | - | $4,970 | |
02 | 2.7231: Use radiant heater for spot heating | $3,064 | $12,000 |
$526
8,206
kWh
|
- |
$2,538
-
MMBtu
|
- | |
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,099 | $4,500 |
$1,682
26,377
kWh
|
$417
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,495 | $365 |
$1,495
23,447
kWh
|
- | - | - | |
05 | 2.4224: Upgrade controls on compressors | $1,402 | $280 |
$1,402
21,981
kWh
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $396 | $280 |
$299
4,689
kWh
|
$97
-
kW-mo/yr
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $206 | $450 |
$206
3,224
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $13,632 | $18,375 |
$5,610
87,924
kWh
|
$514
-
kW-mo/yr
|
$2,538
-
MMBtu
|
$4,970 | ||
TOTAL IMPLEMENTED | $8,469 | $1,875 |
$3,402
53,341
kWh
|
$97
-
kW-mo/yr
|
- | $4,970 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs