ITAC Assessment: MI0339
ITAC logo
ITAC Assessment: MI0339
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Pharmaceuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 360
Plant Area 236,000
ft2
Annual Production 2,600,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,528,881 21,357,534
kWh
Electricity Demand $302,032 39,225
kW-mo/yr
Electricity Fees $5,400 -
Natural Gas $262,800 21,900
MMBtu
TOTAL YEARLY COSTS $4,099,113
RECOMMENDED SAVINGS* $1,974,187 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,353,527

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,225,133 $10,935,180 $854,853
5,180,927
kWh
$54,647
-
kW-mo/yr
$315,633
02 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $279,023 $250,000 $262,260
1,589,460
kWh
$16,763
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $254,041 $3,280 $254,041
1,539,641
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $95,116 $69,861 $86,300
523,030
kWh
$8,816
-
kW-mo/yr
-
05 2.7221: Lower temperature during the winter season and vice-versa $47,520 $480 $44,663
270,684
kWh
$2,857
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $33,278 $2,030 $31,278
189,564
kWh
$2,000
-
kW-mo/yr
-
07 2.3212: Optimize plant power factor $28,281 $41,300 - $28,281
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $11,795 $9,000 $10,609
64,297
kWh
$1,186
-
kW-mo/yr
-
TOTAL RECOMMENDED $1,974,187 $11,311,131 $1,544,004
9,357,603
kWh
$114,550
-
kW-mo/yr
$315,633
TOTAL IMPLEMENTED $1,353,527 $11,007,071 $972,431
5,893,521
kWh
$65,463
-
kW-mo/yr
$315,633
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs