Assessment Year | 1994 |
---|---|
Principal Product | boats |
NAICS |
n/a
|
SIC | 3732: Boat Building and Repairing |
Sales Range | $10 M to 50M |
# of Employees | 102 |
Plant Area |
250,000
ft2
|
Annual Production | 6,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $111,965 | 1,475,381 |
kWh
|
$0.076 |
Natural Gas | $19,992 | 4,695 |
MMBtu
|
$4.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,937 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,441 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $8,462 | $18,000 |
$9,912
84,115
kWh
|
$(-1,450.0)
-
MMBtu
|
|
02 | 2.3191: Use demand controller or load shedder | $5,280 | - |
$5,280
-
kWh
|
- | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $4,594 | $4,000 |
$2,760
100,234
kWh
|
$1,834
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,970 | $3,740 |
$2,970
32,825
kWh
|
- | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $2,760 | $1,500 | - |
$2,760
-
MMBtu
|
|
06 | 2.2437: Recover waste heat from equipment | $1,419 | $2,600 | - |
$1,419
-
MMBtu
|
|
07 | 2.2437: Recover waste heat from equipment | $1,058 | $1,000 | - |
$1,058
-
MMBtu
|
|
08 | 2.7111: Reduce illumination to minimum necessary levels | $203 | - |
$203
4,396
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $191 | $161 |
$191
2,052
kWh
|
- | |
TOTAL RECOMMENDED | $26,937 | $31,001 |
$21,316
223,622
kWh
|
$5,621
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,441 | $3,901 |
$8,441
34,877
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs