ITAC Assessment: MO0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Electric Motors
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $50
M
to 100
M
# of Employees 552
Plant Area 380,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $541,502 13,646,249
kWh
Natural Gas $74,344 25,447
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $133,033 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,806

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $67,868 $8,774 $67,868
1,710,434
kWh
-
02 2.2531: Re-size charging openings or add movable cover or door $5,635 $100 $5,635
142,145
kWh
-
03 2.2531: Re-size charging openings or add movable cover or door $204 - $204
5,275
kWh
-
04 3.4114: Replace city water with recycled water via cooling tower $43,359 $7,325 - $43,359
-
Tgal
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $515 $1,024 $515
12,896
kWh
-
06 2.4133: Use most efficient type of electric motors $9,317 $31,982 $9,317
234,760
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,548 $1,125 $2,548
64,185
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,346 $777 $2,346
59,203
kWh
-
09 2.4221: Install compressor air intakes in coolest locations $907 $554 $907
22,860
kWh
-
10 2.4231: Reduce the pressure of compressed air to the minimum required $334 $20 $334
8,499
kWh
-
TOTAL RECOMMENDED $133,033 $51,681 $89,674
2,260,257
kWh
$43,359
-
Tgal
TOTAL IMPLEMENTED $21,806 $35,582 $21,806
549,823
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs