ITAC Assessment: UU0066
ITAC logo
ITAC Assessment: UU0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product utility trailers
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area 27,000
ft2
Annual Production 220
pieces
Production Hrs. Annual 3,380
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,411 122,960
kWh
Electricity Demand $5,411 664
kW-mo/yr
Electricity Fees $1,386 -
Natural Gas $9,313 1,795
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $739

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.2531: Re-size charging openings or add movable cover or door $2,690 $3,000 - - - $2,690
-
MMBtu
-
02 2.2136: Install / repair insulation on steam lines $340 $200 - - - $340
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $84 $310 $45
1,508
kWh
$39
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $241 $45 $131
4,345
kWh
$110
-
kW-mo/yr
- - -
05 2.3212: Optimize plant power factor $81 $270 - - $81 - -
06 2.7124: Make a practice of turning off lights when not needed $199 $80 $100
3,344
kWh
$99
-
kW-mo/yr
- - -
07 4.821: Pay bills on time to avoid late fees $414 - - - - - $414
TOTAL RECOMMENDED $4,049 $3,905 $276
9,197
kWh
$248
-
kW-mo/yr
$81 $3,030
-
MMBtu
$414
TOTAL IMPLEMENTED $739 $355 $176
5,853
kWh
$149
-
kW-mo/yr
- - $414
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs