ITAC Assessment: TT0260
ITAC logo
ITAC Assessment: TT0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Pork Products
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $5
M
to 10
M
# of Employees 130
Plant Area 69,000
ft2
Annual Production 200,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $320,892 5,309,116
kWh
Electricity Demand $159,807 11,102
kW-mo/yr
Natural Gas $32,235 5,041
MMBtu
Waste Disposal Costs
Water Usage $136,943 20,951
Tgal
Water Disposal $78,781 12,502
Tgal
TOTAL YEARLY COSTS $728,658
RECOMMENDED SAVINGS* $39,375 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,184

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,890 $3,640 $12,890
213,408
kWh
- - -
02 2.3212: Optimize plant power factor $10,005 $10,000 - - $10,005 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,928 $300 $6,928
114,704
kWh
- - -
04 3.4159: Replace treated water with well / surface water $4,069 $16,500 - - - $4,069
-
Tgal
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,791 $1,660 $2,791
46,209
kWh
- - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,508 $3,500 $471
7,800
kWh
$1,037
-
kW-mo/yr
- -
07 2.2511: Insulate bare equipment $783 $700 $783
12,965
kWh
- - -
08 2.7135: Install occupancy sensors $401 $553 $401
6,638
kWh
- - -
TOTAL RECOMMENDED $39,375 $36,853 $24,264
401,724
kWh
$1,037
-
kW-mo/yr
$10,005 $4,069
-
Tgal
TOTAL IMPLEMENTED $1,184 $1,253 $1,184
19,603
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs