Assessment Year | 1993 |
---|---|
Principal Product | Magnet Wire |
NAICS |
n/a
|
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
146,000
ft2
|
Annual Production | 19,200,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $732,234 | 18,475,674 |
kWh
|
$0.040 |
Natural Gas | $366,743 | 53,521 |
MMBtu
|
$6.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $139,048 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,306 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,616 | $995 | - |
$1,616
-
MMBtu
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $3,144 | $1,056 |
$3,144
79,426
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,607 | $840 |
$3,607
91,149
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,396 | $24,210 |
$8,396
211,899
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $13,690 | $30,575 |
$13,690
345,252
kWh
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,617 | $575 |
$1,617
40,739
kWh
|
- | - | |
07 | 2.8113: Purchase gas directly from a contract gas supplier | $106,184 | $8,000 | - | - | $106,184 | |
08 | 2.7261: Install timers and/or thermostats | $794 | $525 |
$558
14,068
kWh
|
$236
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $139,048 | $66,776 |
$31,012
782,533
kWh
|
$1,852
-
MMBtu
|
$106,184 | ||
TOTAL IMPLEMENTED | $15,306 | $31,570 |
$13,690
345,252
kWh
|
$1,616
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs