ITAC Assessment: MO0091
ITAC logo
ITAC Assessment: MO0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Magnet Wire
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 146,000
ft2
Annual Production 19,200,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $732,234 18,475,674
kWh
Natural Gas $366,743 53,521
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $139,048 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,306

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,616 $995 - $1,616
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $3,144 $1,056 $3,144
79,426
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,607 $840 $3,607
91,149
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,396 $24,210 $8,396
211,899
kWh
- -
05 2.4133: Use most efficient type of electric motors $13,690 $30,575 $13,690
345,252
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,617 $575 $1,617
40,739
kWh
- -
07 2.8113: Purchase gas directly from a contract gas supplier $106,184 $8,000 - - $106,184
08 2.7261: Install timers and/or thermostats $794 $525 $558
14,068
kWh
$236
-
MMBtu
-
TOTAL RECOMMENDED $139,048 $66,776 $31,012
782,533
kWh
$1,852
-
MMBtu
$106,184
TOTAL IMPLEMENTED $15,306 $31,570 $13,690
345,252
kWh
$1,616
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs