ITAC Assessment: MO0058
ITAC logo
ITAC Assessment: MO0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product TRUCK AXLES
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 120
Plant Area
n/a
Annual Production 195,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,731 2,719,519
kWh
Natural Gas $17,688 3,054
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,645 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,540

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $1,554 $300 - $1,554
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $1,522 $700 $1,522
24,619
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,618 $20 $1,618
26,377
kWh
- -
04 2.6232: Install set-back timers $1,712 $1,400 $1,712
27,843
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $616 $491 $714
11,723
kWh
- $(-98.0)
06 2.4133: Use most efficient type of electric motors $69 $255 $69
1,172
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $372 - $372
6,155
kWh
- -
08 2.4312: Improve lubrication practices $828 $240 $828
13,482
kWh
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $354 $551 $354
5,862
kWh
- -
TOTAL RECOMMENDED $8,645 $3,957 $7,189
117,233
kWh
$1,554
-
MMBtu
$(-98.0)
TOTAL IMPLEMENTED $2,540 $1,640 $2,540
41,325
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs