ITAC Assessment: MO0035
ITAC logo
ITAC Assessment: MO0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FOLDING CARTONS
NAICS
n/a
SIC 2675: Die-Cut Paper and Paperboard and Cardboard
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area
n/a
Annual Production 400,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $216,114 3,613,130
kWh
LPG $55,819 7,511
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 3.4115: Recover and reuse cooling water $16,673 - $261
4,396
kWh
- $16,412
02 2.4221: Install compressor air intakes in coolest locations $3,077 $415 $3,077
51,583
kWh
- -
03 2.4312: Improve lubrication practices $1,978 $96 $1,978
33,118
kWh
- -
04 2.7261: Install timers and/or thermostats $8,595 $1,161 $2,626
43,962
kWh
$5,969
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,588 - $3,588
60,082
kWh
- -
06 2.4133: Use most efficient type of electric motors $255 $438 $255
4,396
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $441 $1,184 $441
7,327
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,633 $584 $2,633
43,962
kWh
- -
TOTAL RECOMMENDED $37,240 $3,878 $14,859
248,826
kWh
$5,969
-
MMBtu
$16,412
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs