Assessment Year | 1991 |
---|---|
Principal Product | AEROSOL FILLERS |
NAICS |
n/a
|
SIC | 2841: Soap and Other Detergents, Except Specialty Cleaners |
Sales Range | $50 M to 100M |
# of Employees | 165 |
Plant Area |
n/a
|
Annual Production | 40,000,000
pieces
|
Production Hrs. Annual | 6,288
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $138,261 | 1,888,628 |
kWh
|
$0.073 |
Natural Gas | $9,426 | 1,935 |
MMBtu
|
$4.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,262 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,262 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,050 | $75 |
$15,050
205,744
kWh
|
- | |
02 | 2.8114: Change rate schedules or other changes in utility service | $9,195 | - |
$9,195
-
kWh
|
- | |
03 | 2.2437: Recover waste heat from equipment | $5,103 | $1,218 | - |
$5,103
-
MMBtu
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $4,536 | $960 |
$4,536
62,134
kWh
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,055 | $704 | - |
$1,055
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,224 | $115 |
$1,224
16,706
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $124 | $175 |
$124
1,758
kWh
|
- | |
08 | 2.2511: Insulate bare equipment | $879 | $213 |
$879
12,016
kWh
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $96 | - |
$96
1,465
kWh
|
- | |
TOTAL RECOMMENDED | $37,262 | $3,460 |
$31,104
299,823
kWh
|
$6,158
-
MMBtu
|
||
TOTAL IMPLEMENTED | $37,262 | $3,460 |
$31,104
299,823
kWh
|
$6,158
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs