ITAC Assessment: MO0022
ITAC logo
ITAC Assessment: MO0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product VENTILATORS
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 245
Plant Area
n/a
Annual Production 78,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,434 2,050,997
kWh
Natural Gas $35,529 7,040
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,448

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $1,566 $2,267 - $1,566
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,956 $6,256 $2,956
60,961
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,150 $60 $1,150
23,740
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $469 $200 $469
9,672
kWh
-
05 2.4322: Use or replace with energy efficient substitutes $45 $334 $45
879
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $262 - $262
5,275
kWh
-
TOTAL RECOMMENDED $6,448 $9,117 $4,882
100,527
kWh
$1,566
-
MMBtu
TOTAL IMPLEMENTED $6,448 $9,117 $4,882
100,527
kWh
$1,566
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings