Assessment Year | 1990 |
---|---|
Principal Product | WOOD & VINYL WINDOWS |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 212,422
pieces
|
Production Hrs. Annual | 2,645
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $104,249 | 1,090,563 |
kWh
|
$0.096 |
LPG | $62,325 | 12,132 |
MMBtu
|
$5.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,251 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,258 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
---|---|---|---|---|---|---|
01 | 2.7243: Improve air circulation with destratification fans / other methods | $5,407 | $14,600 |
$(-980.0)
(-10,258)
kWh
|
$6,387
-
MMBtu
|
|
02 | 2.7243: Improve air circulation with destratification fans / other methods | $3,851 | $10,420 |
$(-588.0)
(-6,155)
kWh
|
$4,439
-
MMBtu
|
|
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,696 | $2,100 |
$(-490.0)
(-5,275)
kWh
|
$2,186
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,542 | $456 |
$2,542
26,671
kWh
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,989 | $1,400 | - |
$2,989
-
MMBtu
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $1,518 | $100 |
$1,518
15,826
kWh
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $248 | - |
$248
2,638
kWh
|
- | |
TOTAL RECOMMENDED | $18,251 | $29,076 |
$2,250
23,447
kWh
|
$16,001
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,258 | $25,020 |
$(-1,568.0)
(-16,413)
kWh
|
$10,826
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs