| Assessment Year | 2017 |
|---|---|
| Principal Product | Steel framed hospitality seating |
| NAICS | 337127: Institutional Furniture Manufacturing |
| SIC | 2531: Public Building and Related Furniture |
| Sales Range | $50 M to 100M |
| # of Employees | 292 |
| Plant Area |
226,000
ft2
|
| Annual Production | 392,586
pieces
|
| Production Hrs. Annual | 5,000
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $185,301 | 3,487,469 |
kWh
|
$0.053 |
| Electricity Demand | $162,958 | 8,446 |
kW-mo/yr
|
$19.29 |
| Natural Gas | $148,213 | 25,696 |
MMBtu
|
$5.77 |
| TOTAL YEARLY COSTS | $496,472 | |||
| RECOMMENDED SAVINGS* | $32,511 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,743 | $3,000 |
$4,743
89,484
kWh
|
- | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $3,643 | $5,000 |
$3,643
68,731
kWh
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,737 | $20,000 |
$21,737
410,135
kWh
|
- | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $989 | $3,700 | - |
$989
-
MMBtu
|
|
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,399 | $325 | - |
$1,399
-
MMBtu
|
|
| TOTAL RECOMMENDED | $32,511 | $32,025 |
$30,123
568,350
kWh
|
$2,388
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs