ITAC Assessment: UM0484
ITAC logo
ITAC Assessment: UM0484
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Steel framed hospitality seating
NAICS 337127: Institutional Furniture Manufacturing
SIC 2531: Public Building and Related Furniture
Sales Range $50
M
to 100
M
# of Employees 292
Plant Area 226,000
ft2
Annual Production 392,586
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,301 3,487,469
kWh
Electricity Demand $162,958 8,446
kW-mo/yr
Natural Gas $148,213 25,696
MMBtu
TOTAL YEARLY COSTS $496,472
RECOMMENDED SAVINGS* $32,511 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,743 $3,000 $4,743
89,484
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $3,643 $5,000 $3,643
68,731
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,737 $20,000 $21,737
410,135
kWh
-
04 2.2414: Use waste heat from hot flue gases to preheat $989 $3,700 - $989
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,399 $325 - $1,399
-
MMBtu
TOTAL RECOMMENDED $32,511 $32,025 $30,123
568,350
kWh
$2,388
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs