Assessment Year | 2017 |
---|---|
Principal Product | Steel framed hospitality seating |
NAICS | 337127: Institutional Furniture Manufacturing |
SIC | 2531: Public Building and Related Furniture |
Sales Range | $50 M to 100M |
# of Employees | 292 |
Plant Area |
226,000
ft2
|
Annual Production | 392,586
pieces
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $185,301 | 3,487,469 |
kWh
|
$0.053 |
Electricity Demand | $162,958 | 8,446 |
kW-mo/yr
|
$19.29 |
Natural Gas | $148,213 | 25,696 |
MMBtu
|
$5.77 |
TOTAL YEARLY COSTS | $496,472 | |||
RECOMMENDED SAVINGS* | $32,511 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,743 | $3,000 |
$4,743
89,484
kWh
|
- | |
02 | 2.4322: Use or replace with energy efficient substitutes | $3,643 | $5,000 |
$3,643
68,731
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,737 | $20,000 |
$21,737
410,135
kWh
|
- | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $989 | $3,700 | - |
$989
-
MMBtu
|
|
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,399 | $325 | - |
$1,399
-
MMBtu
|
|
TOTAL RECOMMENDED | $32,511 | $32,025 |
$30,123
568,350
kWh
|
$2,388
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs