ITAC Assessment: MA0567
ITAC logo
ITAC Assessment: MA0567
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Recycled tissue paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 50,000
ft2
Annual Production 25,000
ton
Production Hrs. Annual 8,640
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $841,943 15,505,000
kWh
Electricity Demand $388,737 48,801
kW-mo/yr
Electricity Fees $31,982 -
Fuel Oil #6 $1,032,051 225,424
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $160,228 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,433

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Personnel Changes Savings Administrative Changes Savings
01 3.6112: Use filter and drying oven to reduce sludge volume $70,900 $270,000 $(-3,500.0)
(-65,350)
kWh
- - $74,400
02 2.2437: Recover waste heat from equipment $61,633 $54,474 - $61,633
-
MMBtu
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,220 $11,950 $9,220
169,800
kWh
- - -
04 4.111: Add equipment/ operators to reduce production bottleneck $8,762 $1,000 - - $8,762 -
05 2.2511: Insulate bare equipment $4,156 $6,867 - $4,156
-
MMBtu
- -
06 2.4131: Size electric motors for peak operating efficiency $3,942 $5,000 $3,942
72,600
kWh
- - -
07 2.2511: Insulate bare equipment $1,615 $1,369 - $1,615
-
MMBtu
- -
TOTAL RECOMMENDED $160,228 $350,660 $9,662
177,050
kWh
$67,404
-
MMBtu
$8,762 $74,400
TOTAL IMPLEMENTED $85,433 $279,236 $(-3,500.0)
(-65,350)
kWh
$5,771
-
MMBtu
$8,762 $74,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs