ITAC Assessment: MI0417
ITAC logo
ITAC Assessment: MI0417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Bread Loaves
NAICS 311812: Commercial Bakeries
SIC 2041: Flour and Other Grain Mill Products
Sales Range $100
M
to 500
M
# of Employees 85
Plant Area 175,000
ft2
Annual Production 52,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $474,446 9,478,000
kWh
Electricity Demand $226,262 15,219
kW-mo/yr
Electricity Fees $164,928 -
TOTAL YEARLY COSTS $865,636
RECOMMENDED SAVINGS* $127,810 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,684

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4224: Upgrade controls on compressors $58,143 $16,338 $41,284
825,680
kWh
$16,859
-
kW-mo/yr
-
02 2.8114: Change rate schedules or other changes in utility service $25,845 - - - $25,845
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,705 $18,960 $9,018
180,358
kWh
$3,687
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $10,521 $4,259 $7,607
152,149
kWh
$2,914
-
kW-mo/yr
-
05 2.2622: Replace existing chiller with high efficiency model $9,078 $12,846 $6,447
128,940
kWh
$2,631
-
kW-mo/yr
-
06 2.7221: Lower temperature during the winter season and vice-versa $6,907 $580 $3,800
76,002
kWh
$3,107
-
kW-mo/yr
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $2,772 $2,740 $1,969
39,370
kWh
$803
-
kW-mo/yr
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,839 $2,140 $1,304
26,088
kWh
$535
-
kW-mo/yr
-
TOTAL RECOMMENDED $127,810 $57,863 $71,429
1,428,587
kWh
$30,536
-
kW-mo/yr
$25,845
TOTAL IMPLEMENTED $27,684 $2,140 $1,304
26,088
kWh
$535
-
kW-mo/yr
$25,845
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs