ITAC Assessment: MI0389
ITAC logo
ITAC Assessment: MI0389
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Aircraft Landing Gear
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 200,000
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 6,552
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $447,939 6,869,323
kWh
Electricity Demand $183,414 15,687
kW-mo/yr
Electricity Fees $176,961 -
Natural Gas $19,200 5,000
MMBtu
Fuel Oil #2 $5,358 275
MMBtu
TOTAL YEARLY COSTS $832,872
RECOMMENDED SAVINGS* $182,991 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $108,618

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $48,176 $80 - - $48,176 -
02 2.7221: Lower temperature during the winter season and vice-versa $43,876 $480 $35,107
540,115
kWh
$8,769
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $21,739 $33,655 $16,134
248,221
kWh
$5,605
-
kW-mo/yr
- -
04 2.3312: Install efficient rectifiers $21,196 $55,920 $15,841
243,703
kWh
$5,355
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $19,025 $120 $15,237
234,411
kWh
$3,788
-
kW-mo/yr
- -
06 2.2511: Insulate bare equipment $15,421 $6,812 $12,299
189,216
kWh
$3,122
-
kW-mo/yr
- -
07 2.6231: Utilize controls to operate equipment only when needed $10,000 $480 $6,761
104,011
kWh
$3,239
-
kW-mo/yr
- -
08 2.4227: Use compressor air filters $1,420 $1,100 $1,420
21,847
kWh
- - -
09 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,362 $616 $920
14,149
kWh
$257
-
kW-mo/yr
- $185
-
MMBtu
10 2.8112: Combine utility meters $776 $240 - - $776 -
TOTAL RECOMMENDED $182,991 $99,503 $103,719
1,595,673
kWh
$30,135
-
kW-mo/yr
$48,952 $185
-
MMBtu
TOTAL IMPLEMENTED $108,618 $91,891 $84,659
1,302,446
kWh
$23,774
-
kW-mo/yr
- $185
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs