ITAC Assessment: OK0527
ITAC logo
ITAC Assessment: OK0527
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Baked goods
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 120,000
ft2
Annual Production 480,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $330,709 14,536,049
kWh
Electricity Demand $224,973 31,491
kW-mo/yr
Electricity Fees $3,314 -
Natural Gas $64,801 22,725
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $957,886 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $860,636

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 3.1161: Eliminate/reduce an operation $847,565 $200,000 - - $847,565
-
lb
-
02 4.441: Install automatic packing equipment $94,656 $41,000 $(-114.0)
(-2,638)
kWh
- - $94,770
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,517 $18,540 $4,135
140,094
kWh
$1,382
-
kW-mo/yr
- -
04 3.5313: Increase amount of waste recovered for resale $3,375 - - - $3,375
-
lb
-
05 3.5313: Increase amount of waste recovered for resale $2,414 $8,400 $1,809
61,254
kWh
$605
-
kW-mo/yr
- -
06 2.7111: Reduce illumination to minimum necessary levels $2,414 $81 $1,809
61,254
kWh
$605
-
kW-mo/yr
- -
07 2.2696: Use excess cold process fluid for industrial cooling needs $1,608 $14,500 $1,608
70,926
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $157 $1,080 $118
4,103
kWh
$39
-
kW-mo/yr
- -
09 3.1291: Eliminate practice of mixing waste streams $180 - - - $180
-
lb
-
TOTAL RECOMMENDED $957,886 $283,601 $9,365
334,993
kWh
$2,631
-
kW-mo/yr
$851,120
-
lb
$94,770
TOTAL IMPLEMENTED $860,636 $242,520 $7,670
276,377
kWh
$2,026
-
kW-mo/yr
$850,940
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs