ITAC Assessment: LT0034
ITAC logo
ITAC Assessment: LT0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PLYWOOD
NAICS
n/a
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 346
Plant Area
n/a
Annual Production 200,000
thousand feet
Production Hrs. Annual 6,700
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,820,645 32,092,322
kWh
Natural Gas $25,403 5,513
MMBtu
Wood $1,114,350 1,277,788
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $205,051 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,203

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Administrative Changes Savings
01 2.2514: Cover open tanks $3,245 $1,440 - $3,245
-
MMBtu
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $13,200 - $16,930
286,635
kWh
- $(-3,730.0)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,708 - $24,990
521,688
kWh
- $(-7,282.0)
04 2.2136: Install / repair insulation on steam lines $1,050 $417 - $1,050
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $166,000 $18,000 - $166,000
-
MMBtu
-
06 2.7111: Reduce illumination to minimum necessary levels $3,848 - $3,848
67,409
kWh
- -
TOTAL RECOMMENDED $205,051 $19,857 $45,768
875,732
kWh
$170,295
-
MMBtu
$(-11,012.0)
TOTAL IMPLEMENTED $35,203 $1,857 $41,920
808,323
kWh
$4,295
-
MMBtu
$(-11,012.0)