Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product refrigeration products
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 82,725
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,585 1,512,787
kWh
Electricity Demand $63,873 5,716
kW-mo/yr
Electricity Fees $25,580 -
TOTAL YEARLY COSTS $164,038
RECOMMENDED SAVINGS* $22,091 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,261

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7425: Clean or color roof to reduce solar load $9,722 $20,153 $2,861
58,387
kWh
$6,861
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,712 $2,100 $2,360
48,162
kWh
$1,352
-
kW-mo/yr
03 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $1,971 $965 $1,256
25,629
kWh
$715
-
kW-mo/yr
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,948 $2,692 $898
18,330
kWh
$1,050
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,932 $4,843 $893
18,232
kWh
$1,039
-
kW-mo/yr
06 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $939 $280 $436
8,888
kWh
$503
-
kW-mo/yr
07 2.7492: Use proper thickness of insulation on building envelope $911 $1,214 $419
8,553
kWh
$492
-
kW-mo/yr
08 2.7135: Install occupancy sensors $617 $1,522 $617
12,587
kWh
-
09 2.4224: Upgrade controls on compressors $339 $984 $127
2,593
kWh
$212
-
kW-mo/yr
TOTAL RECOMMENDED $22,091 $34,753 $9,867
201,361
kWh
$12,224
-
kW-mo/yr
TOTAL IMPLEMENTED $17,261 $29,882 $7,294
148,849
kWh
$9,967
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs