Assessment Year | 2020 |
---|---|
Principal Product | Medical Devices |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
55,000
ft2
|
Annual Production | 600,000
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $188,096 | 1,023,660 |
kWh
|
$0.18 |
Electricity Demand | $30,602 | 3,400 |
kW-mo/yr
|
$9.00 |
Electricity Fees | $20,699 | - |
|
- |
TOTAL YEARLY COSTS | $239,397 | |||
RECOMMENDED SAVINGS* | $66,969 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $53,178 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7425: Clean or color roof to reduce solar load | $31,298 | $16,924 |
$25,969
141,136
kWh
|
$5,329
-
kW-mo/yr
|
- | |
02 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $13,791 | $2,940 |
$11,442
62,185
kWh
|
$2,349
-
kW-mo/yr
|
- | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $8,339 | $39,554 |
$7,817
42,483
kWh
|
$522
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,279 | $10,827 |
$3,469
18,851
kWh
|
$810
-
kW-mo/yr
|
- | |
05 | 2.7135: Install occupancy sensors | $3,930 | $1,355 | - | - | $3,930 | |
06 | 2.3212: Optimize plant power factor | $2,326 | $1,672 | - | - | $2,326 | |
07 | 2.4224: Upgrade controls on compressors | $1,717 | $3,320 |
$1,249
6,788
kWh
|
$468
-
kW-mo/yr
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $663 | $1,980 |
$474
2,574
kWh
|
$189
-
kW-mo/yr
|
- | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $626 | $1,661 |
$518
2,813
kWh
|
$108
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $66,969 | $80,233 |
$50,938
276,830
kWh
|
$9,775
-
kW-mo/yr
|
$6,256 | ||
TOTAL IMPLEMENTED | $53,178 | $77,293 |
$39,496
214,645
kWh
|
$7,426
-
kW-mo/yr
|
$6,256 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs