ITAC Assessment: MI0355
ITAC logo
ITAC Assessment: MI0355
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Printing Ink
NAICS 334118: Computer Terminal and Other Computer Peripheral Equipment Manufacturing
SIC 3577: Computer Peripheral Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 130,000
ft2
Annual Production 793
Tgal
Production Hrs. Annual 4,160
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $994,746 5,962,683
kWh
Electricity Demand $114,122 13,636
kW-mo/yr
Electricity Fees $5,400 -
TOTAL YEARLY COSTS $1,114,268
RECOMMENDED SAVINGS* $504,543 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $159,147

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $139,703 $245,760 $130,706
782,670
kWh
$8,997
-
kW-mo/yr
02 2.6218: Turn off equipment when not in use $103,161 $14,000 $103,161
617,731
kWh
-
03 2.7425: Clean or color roof to reduce solar load $91,845 $61,708 $85,928
514,539
kWh
$5,917
-
kW-mo/yr
04 2.7221: Lower temperature during the winter season and vice-versa $95,703 $480 $89,594
536,493
kWh
$6,109
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $31,941 $59,135 $27,907
167,107
kWh
$4,034
-
kW-mo/yr
06 2.4226: Use / purchase optimum sized compressor $20,441 $72,870 $17,068
102,205
kWh
$3,373
-
kW-mo/yr
07 2.7229: Air condition only space necessary $13,642 $960 $12,763
76,428
kWh
$879
-
kW-mo/yr
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,503 $2,020 $3,758
22,502
kWh
$745
-
kW-mo/yr
09 2.6127: Maintain air filters by cleaning or replacement $3,604 $2,070 $3,010
18,024
kWh
$594
-
kW-mo/yr
TOTAL RECOMMENDED $504,543 $459,003 $473,895
2,837,699
kWh
$30,648
-
kW-mo/yr
TOTAL IMPLEMENTED $159,147 $148,075 $151,146
905,067
kWh
$8,001
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs