| Assessment Year | 2001 |
|---|---|
| Principal Product | Smoked Meats |
| NAICS |
n/a
|
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $5 M to 10M |
| # of Employees | 55 |
| Plant Area |
40,000
ft2
|
| Annual Production | 3,000,000
lb
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $46,617 | 1,564,329 |
kWh
|
$0.030 |
| Electricity Demand | $24,560 | 2,317 |
kW-mo/yr
|
$10.60 |
| Electricity Fees | $9,033 | - |
|
- |
| Natural Gas | $34,079 | 5,529 |
MMBtu
|
$6.16 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $68,977 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $55,771 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1232: Keep boiler tubes clean | $5,290 | $3,000 | - | - | - |
$5,290
-
MMBtu
|
- | - | - | - | |
| 02 | 2.2531: Re-size charging openings or add movable cover or door | $6,057 | $5,500 |
$1,669
56,000
kWh
|
$776
-
kW-mo/yr
|
$172 | - | - | $3,440 | - | - | |
| 03 | 3.5217: Reuse / recycle/ sell paper products | $2,040 | $6,700 | - | - | - | - |
$2,520
-
lb
|
$(-3,000.0) | $2,520 | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,680 | $3,496 |
$915
30,716
kWh
|
$654
-
kW-mo/yr
|
$111 | - | - | - | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $103 | $72 |
$56
1,887
kWh
|
$40
-
kW-mo/yr
|
$7 | - | - | - | - | - | |
| 06 | 3.4141: Replace the chlorination stage with an oxygen or ozone stage | $7,808 | - | - | - | - |
$1,860
-
MMBtu
|
- | - | - |
$5,948
-
Tgal
|
|
| 07 | 4.454: Modify startup/shutdown times | $45,820 | - | - | - | - |
$2,500
-
MMBtu
|
- | $36,000 | - |
$7,320
-
Tgal
|
|
| 08 | 2.7135: Install occupancy sensors | $179 | $250 |
$167
5,600
kWh
|
- | $12 | - | - | - | - | - | |
| TOTAL RECOMMENDED | $68,977 | $19,018 |
$2,807
94,203
kWh
|
$1,470
-
kW-mo/yr
|
$302 |
$9,650
-
MMBtu
|
$2,520
-
lb
|
$36,440 | $2,520 |
$13,268
-
Tgal
|
||
| TOTAL IMPLEMENTED | $55,771 | $6,772 |
$56
1,887
kWh
|
$40
-
kW-mo/yr
|
$7 |
$4,360
-
MMBtu
|
$2,520
-
lb
|
$33,000 | $2,520 |
$13,268
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs