ITAC Assessment: GT0707
ITAC logo
ITAC Assessment: GT0707
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Smoked Meats
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 40,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,617 1,564,329
kWh
Electricity Demand $24,560 2,317
kW-mo/yr
Electricity Fees $9,033 -
Natural Gas $34,079 5,529
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,977 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,771

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 2.1232: Keep boiler tubes clean $5,290 $3,000 - - - $5,290
-
MMBtu
- - - -
02 2.2531: Re-size charging openings or add movable cover or door $6,057 $5,500 $1,669
56,000
kWh
$776
-
kW-mo/yr
$172 - - $3,440 - -
03 3.5217: Reuse / recycle/ sell paper products $2,040 $6,700 - - - - $2,520
-
lb
$(-3,000.0) $2,520 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,680 $3,496 $915
30,716
kWh
$654
-
kW-mo/yr
$111 - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $103 $72 $56
1,887
kWh
$40
-
kW-mo/yr
$7 - - - - -
06 3.4141: Replace the chlorination stage with an oxygen or ozone stage $7,808 - - - - $1,860
-
MMBtu
- - - $5,948
-
Tgal
07 4.454: Modify startup/shutdown times $45,820 - - - - $2,500
-
MMBtu
- $36,000 - $7,320
-
Tgal
08 2.7135: Install occupancy sensors $179 $250 $167
5,600
kWh
- $12 - - - - -
TOTAL RECOMMENDED $68,977 $19,018 $2,807
94,203
kWh
$1,470
-
kW-mo/yr
$302 $9,650
-
MMBtu
$2,520
-
lb
$36,440 $2,520 $13,268
-
Tgal
TOTAL IMPLEMENTED $55,771 $6,772 $56
1,887
kWh
$40
-
kW-mo/yr
$7 $4,360
-
MMBtu
$2,520
-
lb
$33,000 $2,520 $13,268
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs