ITAC Assessment: MI0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Pharmaceutical Pill Packaging
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area 200,000
ft2
Annual Production 840,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $387,392 5,993,700
kWh
Electricity Demand $138,777 19,304
kW-mo/yr
Electricity Fees $87,818 -
TOTAL YEARLY COSTS $613,987
RECOMMENDED SAVINGS* $379,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $321,869

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.2628: Utilize a less expensive cooling method $236,442 $800,000 $183,621
2,824,941
kWh
$27,821
-
kW-mo/yr
$25,000
02 2.7496: Install partitions to reduce size of conditioned space $37,140 $43,838 $32,251
496,164
kWh
$4,889
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $32,079 $2,030 $26,364
405,586
kWh
$5,715
-
kW-mo/yr
-
04 2.6218: Turn off equipment when not in use $30,500 $3,280 $30,500
469,227
kWh
- -
05 2.7425: Clean or color roof to reduce solar load $17,400 $71,328 $9,600
147,692
kWh
$7,800
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $16,044 $2,973 $13,183
202,819
kWh
$2,861
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $4,421 $1,005 $3,631
55,847
kWh
$790
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,552 $7,675 $2,732
42,032
kWh
$820
-
kW-mo/yr
-
09 2.7447: Install vinyl strip / high speed / air curtain doors $1,896 $6,486 $1,637
25,179
kWh
$259
-
kW-mo/yr
-
TOTAL RECOMMENDED $379,474 $938,615 $303,519
4,669,487
kWh
$50,955
-
kW-mo/yr
$25,000
TOTAL IMPLEMENTED $321,869 $890,799 $254,454
3,914,657
kWh
$42,415
-
kW-mo/yr
$25,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs