Assessment Year | 2018 |
---|---|
Principal Product | Surgical Products |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
35,000
ft2
|
Annual Production | 100,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $102,974 | 1,951,740 |
kWh
|
$0.053 |
Electricity Demand | $36,218 | 3,409 |
kW-mo/yr
|
$10.62 |
Electricity Fees | $25,377 | - |
|
- |
Fuel Oil #2 | $59,451 | 2,512 |
MMBtu
|
$23.67 |
TOTAL YEARLY COSTS | $224,020 | |||
RECOMMENDED SAVINGS* | $351,865 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,602 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.231: Purchase equipment instead of leasing | $304,263 | $795,000 | - | - |
$59,451
-
MMBtu
|
$244,812 | |
02 | 2.7229: Air condition only space necessary | $17,320 | $2,724 |
$13,177
248,614
kWh
|
$4,143
-
kW-mo/yr
|
- | - | |
03 | 2.8114: Change rate schedules or other changes in utility service | $10,427 | $320 | - | - | - | $10,427 | |
04 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $7,399 | $15,000 |
$5,806
109,557
kWh
|
$1,593
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,026 | $13,843 |
$3,050
57,551
kWh
|
$1,976
-
kW-mo/yr
|
- | - | |
06 | 2.3192: Use fossil fuel powered generator during peak demand periods | $4,911 | $80 | - | - | - | $4,911 | |
07 | 2.2511: Insulate bare equipment | $2,191 | $2,240 |
$1,678
31,668
kWh
|
$513
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $328 | $826 |
$328
6,185
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $351,865 | $830,033 |
$24,039
453,575
kWh
|
$8,225
-
kW-mo/yr
|
$59,451
-
MMBtu
|
$260,150 | ||
TOTAL IMPLEMENTED | $47,602 | $35,033 |
$24,039
453,575
kWh
|
$8,225
-
kW-mo/yr
|
- | $15,338 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs