ITAC Assessment: MI0309
ITAC logo
ITAC Assessment: MI0309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Tortillas
NAICS 311830: Tortilla Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 40,000
ft2
Annual Production 1,040,000
bushels
Production Hrs. Annual 4,468
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,454 2,403,840
kWh
Electricity Demand $88,674 7,386
kW-mo/yr
Electricity Fees $28,731 -
Natural Gas $164,562 19,846
MMBtu
Waste Disposal Costs
Water Usage $35,616 4,467,804
Tgal
Water Disposal $46,292 4,468
Tgal
TOTAL YEARLY COSTS $466,329
RECOMMENDED SAVINGS* $50,993 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,993

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.7261: Install timers and/or thermostats $16,370 $1,640 $16,370
380,692
kWh
- - - -
02 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $13,394 $34,000 $7,583
176,351
kWh
$5,811
-
kW-mo/yr
- - -
03 2.7221: Lower temperature during the winter season and vice-versa $6,478 $320 $4,286
99,683
kWh
$2,192
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $4,544 $1,640 - - $4,544
-
MMBtu
- -
05 3.4116: Meter recycled water (to reduce sewer charges) $4,389 $1,729 - - - $4,389
-
Tgal
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $3,090 $1,882 $1,749
40,664
kWh
$1,341
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,772 $6,223 $1,037
24,118
kWh
$735
-
kW-mo/yr
- - -
08 2.3135: Schedule routine maintenance during non-operating periods $649 $210 - - - - $649
09 2.7135: Install occupancy sensors $307 $1,591 $307
7,139
kWh
- - - -
TOTAL RECOMMENDED $50,993 $49,235 $31,332
728,647
kWh
$10,079
-
kW-mo/yr
$4,544
-
MMBtu
$4,389
-
Tgal
$649
TOTAL IMPLEMENTED $50,993 $49,235 $31,332
728,647
kWh
$10,079
-
kW-mo/yr
$4,544
-
MMBtu
$4,389
-
Tgal
$649
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs