Assessment Year | 2017 |
---|---|
Principal Product | Tortillas |
NAICS | 311830: Tortilla Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
40,000
ft2
|
Annual Production | 1,040,000
bushels
|
Production Hrs. Annual | 4,468
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $102,454 | 2,403,840 |
kWh
|
$0.043 | |
Electricity Demand | $88,674 | 7,386 |
kW-mo/yr
|
$12.01 | |
Electricity Fees | $28,731 | - |
|
- | |
Natural Gas | $164,562 | 19,846 |
MMBtu
|
$8.29 | |
Waste Disposal Costs | |||||
Water Usage | $35,616 | 4,467,804 |
Tgal
|
$0.008 | |
Water Disposal | $46,292 | 4,468 |
Tgal
|
$10.36 | |
TOTAL YEARLY COSTS | $466,329 | ||||
RECOMMENDED SAVINGS* | $50,993 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $50,993 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $16,370 | $1,640 |
$16,370
380,692
kWh
|
- | - | - | - | |
02 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $13,394 | $34,000 |
$7,583
176,351
kWh
|
$5,811
-
kW-mo/yr
|
- | - | - | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $6,478 | $320 |
$4,286
99,683
kWh
|
$2,192
-
kW-mo/yr
|
- | - | - | |
04 | 2.2511: Insulate bare equipment | $4,544 | $1,640 | - | - |
$4,544
-
MMBtu
|
- | - | |
05 | 3.4116: Meter recycled water (to reduce sewer charges) | $4,389 | $1,729 | - | - | - |
$4,389
-
Tgal
|
- | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,090 | $1,882 |
$1,749
40,664
kWh
|
$1,341
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,772 | $6,223 |
$1,037
24,118
kWh
|
$735
-
kW-mo/yr
|
- | - | - | |
08 | 2.3135: Schedule routine maintenance during non-operating periods | $649 | $210 | - | - | - | - | $649 | |
09 | 2.7135: Install occupancy sensors | $307 | $1,591 |
$307
7,139
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $50,993 | $49,235 |
$31,332
728,647
kWh
|
$10,079
-
kW-mo/yr
|
$4,544
-
MMBtu
|
$4,389
-
Tgal
|
$649 | ||
TOTAL IMPLEMENTED | $50,993 | $49,235 |
$31,332
728,647
kWh
|
$10,079
-
kW-mo/yr
|
$4,544
-
MMBtu
|
$4,389
-
Tgal
|
$649 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs