ITAC Assessment: AM0895
ITAC logo
ITAC Assessment: AM0895
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Elementary School Students
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 47,080
ft2
Annual Production 100
units
Production Hrs. Annual 3,427
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,564 530,304
kWh
Electricity Demand $32,587 2,465
kW-mo/yr
Natural Gas $9,996 966
MMBtu
TOTAL YEARLY COSTS $65,147
RECOMMENDED SAVINGS* $17,658 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $3,705 $20,000 $453
10,640
kWh
- $3,252
-
MMBtu
02 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $2,191 $72,800 $1,400
32,897
kWh
- $791
-
MMBtu
03 2.9114: Use solar heat to make electricty $11,762 $218,737 $9,462
222,379
kWh
$2,300
-
kW-mo/yr
-
TOTAL RECOMMENDED $17,658 $311,537 $11,315
265,916
kWh
$2,300
-
kW-mo/yr
$4,043
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs