ITAC Assessment: MI0306
ITAC logo
ITAC Assessment: MI0306
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product plastic cups
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 113,000
ft2
Annual Production 16,000,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,972 2,754,180
kWh
Electricity Demand $63,062 6,066
kW-mo/yr
Electricity Fees $44,365 -
TOTAL YEARLY COSTS $241,399
RECOMMENDED SAVINGS* $101,511 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,869

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.3113: Make ice during off peak hours for cooling $53,389 $312,800 - $37,467
-
kW-mo/yr
$15,922
02 2.7142: Utilize higher efficiency lamps and/or ballasts $13,953 $33,615 $7,102
144,947
kWh
$6,851
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $7,316 $240 $7,316
149,300
kWh
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $4,609 $8,095 $3,413
69,643
kWh
$1,196
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,512 $14,280 $4,512
92,077
kWh
- -
06 2.2437: Recover waste heat from equipment $4,286 $9,500 $4,286
87,486
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,134 $1,660 $1,711
34,922
kWh
$2,423
-
kW-mo/yr
-
08 2.7496: Install partitions to reduce size of conditioned space $3,893 $8,040 $2,417
49,325
kWh
$1,476
-
kW-mo/yr
-
09 2.4221: Install compressor air intakes in coolest locations $2,238 $650 $1,573
32,099
kWh
$665
-
kW-mo/yr
-
10 2.7135: Install occupancy sensors $1,858 $177 $1,858
37,923
kWh
- -
11 2.7221: Lower temperature during the winter season and vice-versa $711 $120 $711
14,500
kWh
- -
12 2.7135: Install occupancy sensors $612 $1,630 $612
12,496
kWh
- -
TOTAL RECOMMENDED $101,511 $390,807 $35,511
724,718
kWh
$50,078
-
kW-mo/yr
$15,922
TOTAL IMPLEMENTED $16,869 $4,477 $13,781
281,240
kWh
$3,088
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs