ITAC Assessment: CO0738
ITAC logo
ITAC Assessment: CO0738
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product kitchen cabinets
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 30,000
ft2
Annual Production 12,600
units
Production Hrs. Annual 2,625
hrs
Location (State) Wyoming

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,444 592,830
kWh
Electricity Demand $64,804 2,800
kW-mo/yr
Electricity Fees $2,064 -
Natural Gas $15,345 2,713
MMBtu
Waste Disposal Costs
Water Usage $747 101
Tgal
Solid Waste (non-haz) $30,000 516,000
lb
TOTAL YEARLY COSTS $150,404
RECOMMENDED SAVINGS* $35,333 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,841

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $33,173 $307,768 $19,155
303,093
kWh
$14,018
-
kW-mo/yr
02 2.4226: Use / purchase optimum sized compressor $1,613 $2,285 $537
8,472
kWh
$1,076
-
kW-mo/yr
03 2.7135: Install occupancy sensors $319 $292 $319
5,044
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $228 $200 $93
1,473
kWh
$135
-
kW-mo/yr
TOTAL RECOMMENDED $35,333 $310,545 $20,104
318,082
kWh
$15,229
-
kW-mo/yr
TOTAL IMPLEMENTED $1,841 $2,485 $630
9,945
kWh
$1,211
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs